Top banner
9/11/2017

ACUD cooperates with DELPHI IMM (Germany) in the system application of geographic information system (GIS) to build the planning database in Vietnam

ACUD cooperates with DELPHI IMM (Germany) in the system application of geographic information system (GIS) to build the planning database in Vietnam

On 8/16/2017, Joint Stock Company ACUD cooperated with Delphi IMM Company - Federal Republic of Germany to organize the exchange event regarding planning data management developed by Geographic Information System (GIS).

Currently, the development, implementation, management of urban planning in our country are inadequate. Archives are often hand-made, missing and difficult to update regularly and sometimes incomplete, inaccurate ... causing a lot of difficulties for urban management in general. Therefore, it is required to have a new, modern and effective management method.

According to a number of domestic GIS applications, the use of geographic information systems (GIS) in the planning, implementation, management of urban planning is very effective. the result. However, there are still some problems in applying GIS in urban management in our country:

- Advantage:

+ The strong development of science and technology, especially the information technology

 - Difficult:

+ Limited staff of the system.

+ Difficulty in updating information due to its sensitiveness.

With practical experience when participating in a series of construction planning projects (regional construction planning, urban master planning, zoning planning, detailed planning, rural residential area planning, etc.). ), Investment and design Consultancy Joint Stock Company (ACUD) has gradually recognized GIS as a useful tool in integrating database systems. with This map has been widely adopted in many developed countries. Appying GIS in the field of construction planning will help renovate and improve the efficiency of design as well as an effective tool for departments, sectors and localities in urban development management.

Therefore, on 8/16/2017, ACUD has cooperated with Delphi IMM Company - Federal Republic of Germany to hold an exchange program regarding data management for construction planning by geographic information system ( GIS).

Attending the meeting, there was the presence of representatives of ACUD Company: Dr. Ms. Minh Cuong - Chairman of the Board, expert TS. Pham Huu Duc - Senior Expert, MSc. Bach Ngoc Tung - Planning Manager and Representative of Delphi IMM - Mr. Rolf Lessing - Company Director, Mr. Ralf Puchert, Mr. Mario Stutzki - Expert.

Rolf Lessing - Director of Delphi IMM: Introduction about the company and sharing experience when applying GIS in Germany

 During the meeting, both sides exchanged practical experiences in the standardization of GIS database in the planning project, building a database of dwelling houses in localities; developing database on current status of urban development (topography, geology, land use, social infrastructure, technical infrastructure, environment, digital elevation models, etc); In addition, the two sides pointed out the shortcomings that exist in Vietnam and provide solutions when applying GIS in urban planning, implementation and management.. Because, the planning project will improve its quality and efficiency with a more detailed and accurate data.

Sharing from both sides

The meeting was spectacularly successful, the representatives of the two companies agreed to work together, step  by step build the GIS system into construction planning field in Vietnam.

 

Tin khác

Xem thêm
ACUD.VN

Đăng ký nhận bản tin


Về đầu trang