Overpass on National Highway 18 to Port at Km6

Scale: Total length of 679 meters, including a main bridge of 66 meters, approach roads on both ends measuring 248 meters, and 365 meters of connection roads to the existing route. The bridge structure uses pre-stressed reinforced concrete (BTCT) with Super T beams spanning 33 meters.

Investor: Northeast Corporation – Ministry of National Defense.